FRIDAY, JULY 2, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor finished removing the mechanical room CMU wall on the 2nd Floor.
- Crews continued to run conduit and installed electrical panel D1A.
- The CMU wall for Elevators 1, 2, and 3 was installed on the 1st Floor.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing conduits for the electrical panels in the new 2nd Floor switchgear room.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor continued building formwork for the corner concrete curbs.
- They poured the concrete curbs for the islands.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor continued to install light shades in the elevator lobby and the Directors office.