Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, JULY 21, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor demolished the old electrical panel D1A on the 1st Floor.
  • Existing concrete pads were removed to make room for the new fire pumps on the 2nd Floor.
  • Workers continue to install conduit for the light fixtures in the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continues running electrical conduit on the 8th Floor.
  • The general contractor patched a CMU wall on the 1st Floor

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor removed concrete near the electrical room in the B Tower.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor is building the concrete forms for the connecting sidewalks and curbs.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor roughed in and installed the emergency light fixtures.