FRIDAY, JULY 23, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued rewiring the electrical panels in the 1st Floor electrical room.
- Workers continued to install conduit for the light fixtures in the 1st Floor.
- The contractor secured the jobsite for the tropical storm.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor continued roughing in and installing the exit light fixtures.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continued running electrical conduit on the 8th Floor.
- Crews continued installing receptacles and lights in elevator pits.
- The contractor installed the formwork for Elevators 1 and 2.
- They secured the jobsite for the tropical storm.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor began removing the wooden forms from the new elevated enclosure.
- The contractor continued to install electrical conduit in the 1st Floor B Tower electrical room.
- The jobsite was secured for the tropical storm.