Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, JULY 23, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued rewiring the electrical panels in the 1st Floor electrical room.
  • Workers continued to install conduit for the light fixtures in the 1st Floor.
  • The contractor secured the jobsite for the tropical storm.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued roughing in and installing the exit light fixtures.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running electrical conduit on the 8th Floor.
  • Crews continued installing receptacles and lights in elevator pits.
  • The contractor installed the formwork for Elevators 1 and 2.
  • They secured the jobsite for the tropical storm.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor began removing the wooden forms from the new elevated enclosure.
  • The contractor continued to install electrical conduit in the 1st Floor B Tower electrical room.
  • The jobsite was secured for the tropical storm.