Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, JULY 27, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued rewiring the electrical panels in the 1st Floor electrical room.
  • They removed power to the heating hot water lines.
  • Crews removed sheetrock and ceilings from Rooms 218 and 219.
  • The contractor started relocating the fire panel to the 2nd Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running electrical conduit on the 8th Floor.
  • Electricians continued installing receptacles and lights in the elevator pits.
  • The contractor continued installing formwork for Elevators 1 and 2.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing the wooden forms from the roof of the elevated enclosure.
  • Workers continued to install electrical conduit in the 1st Floor B Tower electrical room.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor demolished sidewalks and the existing driveway, excavated for the new driveway, and removed debris and graded the perimeter of the lot.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued roughing in and installing the exit light fixtures.