Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JULY 29, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued rewiring the electrical panels in the 1st Floor electrical room.
  • Crews continued removing metal wall studs and removed floor tiles from Rooms 218 and 219.
  • The contractor continued removing the heating hot water pumps from the 2nd Floor mechanical room.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued making penetrations in the roof deck for the emergency generators electrical conduit.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued the electrical rough-in for the 2nd level of the elevated enclosure.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor poured concrete for the sidewalks and driveway.
  • They installed bollards and sign posts for the handicap signs.
  • Workers roughed-in conduit for the new electrical utility service.