THURSDAY, JULY 29, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued rewiring the electrical panels in the 1st Floor electrical room.
- Crews continued removing metal wall studs and removed floor tiles from Rooms 218 and 219.
- The contractor continued removing the heating hot water pumps from the 2nd Floor mechanical room.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor continued making penetrations in the roof deck for the emergency generators electrical conduit.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor continued the electrical rough-in for the 2nd level of the elevated enclosure.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor poured concrete for the sidewalks and driveway.
- They installed bollards and sign posts for the handicap signs.
- Workers roughed-in conduit for the new electrical utility service.