ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to run conduit and installed electrical panel D1A.
  • Workers cleaned the CMU wall for Elevators 1, 2, and 3 on the 1st Floor.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor continued building formwork for the concrete curbs.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued to install light shades in the elevator lobby and the Directors office.
  • The ceiling tile installation in the large conference room has been completed.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduit in the 1st Floor ceiling for the electrical panels on the 2nd Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed twenty feet of electrical conduit in the main driveway and back filled the area.