ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor completed removing the elevator shaft wall.   

·         New valves were installed on the heating hot water lines and workers continued removing the old heating hot water lines.

·         Crews began removing the curtain wall on the 2nd Floor.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor installed 4 additional precast panels on the 2nd Floor and roof level of the elevated enclosure.

·         27 of the 40 panels have now been installed.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         Workers continued to remove paint from the 1st Floor walls.

·         The contractor continued to torque the bus duct in the switchgear.

·         The granite thresholds for Elevators 3 and 4 were installed.

·         The contractor replaced broken granite panels on the exterior of the 1st Floor.

 

DENTAL SCHOOL PATIENT PARKING LOT:

·         The contractor sloped and graded the area between the sidewalk and Florida Avenue and prepared the light pole concrete bases for paint.