FRIDAY, AUGUST 27, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The masonry contractor continued installing the metal lathe for the stucco walls in the Tiger Room.
- The contractor continued welding connections for the chilled water lines on the 2nd Floor.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing electrical conduits on the 2nd level of the elevated enclosure.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continued installing bus duct in the 2nd Floor switchgear room.
CEB COVERED WALKWAY:
- The contractor poured concrete for the footer near the District Entergy Garage.