ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in the Tiger Room.
  • The contractor continued welding connections for the chilled water lines on the 2nd Floor.
  • Workers installed CMU blocks surrounding the storefronts.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits on the 2nd level of the enclosure.
  • They built forms for mechanical equipment concrete pads on the 2nd level.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor installed bus duct through the wall of the Entergy transformer vault and installed 4 tap boxes in electrical riser A and B.