MONDAY, SEPTEMBER 13, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The masonry contractor continued installing metal lathe for the stucco walls in rooms along the Bolivar Street on the 1st Floor.
- The contractor continued making fittings for the chilled water and heating hot water lines.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor poured concrete for the parking islands on the ground floor.
- The electrical contractor continued installing conduits on the 2nd Floor.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The electrical contractor installed the last section of bus duct that connects the switchgear to the Entergy vault.