ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor made more fittings and ran heating hot water lines on the 2nd Floor.
  • Workers started installing the raised platforms for the AHUs on the 1st Floor.
  • The contractor began making plumbing connections for the Mens restroom on the 1st Floor.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued installing conduits on the 2nd level of the elevated enclosure.
  • The contractor primed the walls of the storage room on the 1st Floor, C-Tower.