WEDNESDAY, SEPTEMBER 29, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor made more fittings and ran heating hot water lines on the 2nd Floor.
- Workers started installing the raised platforms for the AHUs on the 1st Floor.
- The contractor began making plumbing connections for the Mens restroom on the 1st Floor.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continued installing conduits on the 2nd level of the elevated enclosure.
- The contractor primed the walls of the storage room on the 1st Floor, C-Tower.
|