Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, OCTOBER 15, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued applying the 3rd coat of stucco to the stairwells along Bolivar Street and continued applying the 2nd and 3rd coats in the Tiger Room. 
  • Crews installed additional heating hot water lines on the 2nd floor.
  • Ductwork is being installed in the main corridors of the 1st Floor. 
  • The contractor continued demolition of selected 2nd Floor office areas.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor placed the cap sheet layer of the roof of the new building.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing the metal lathe on the walls in Room 125.

CEB COVERED WALKWAY:

  • The contractor completed installing reinforcing bars in the center section of the sidewalk.
  • Three quarters of the walkway canopy tube steel rafters have been erected.