Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, OCTOBER 22, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued applying the 3rd coat of stucco to the Tiger Room and the 1st and 2nd coats to the Womens bathroom on the 1st Floor. 
  • Workers continue with the installation of heating hot water lines on the 2nd Floor.
  • Crews placed the remaining CMU around the doorframe leading into the 1st Floor Womens restroom. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing flashing cap sheet around the steel platform columns and the conduit penetrations on the roof of the elevated structure.
  • Workers continued installing conduits for the transformer disconnect panels on the steel platform of the roof.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor applied the 2nd coat of plaster in the Mens and Womens 1st Floor restrooms.
  • The remaining two concrete shaft walls for the freight elevator were poured.