TUESDAY, OCTOBER 26, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued applying the 3rd coat of stucco to the Womens restroom and the 1st coat above the storefronts along Bolivar Street.
- Workers continued fabricating heating hot water lines for the 2nd Floor.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractors began installing electrical conduits from the rooftop transformers through the roof.
- Crews began installing the generator exhaust pipe on the roof.
- The contractor began flashing the parapet wall.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor patched the concrete voids of the freight elevator shaft.
CSRB EXHAUST UPGRADE:
- The contractor installed a temporary wall in the 1st Floor corridor of the S. Prieur/Perdido quadrant in preparation for ceiling demolition.