Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, NOVEMBER 10, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing studs for the 2nd Floor auditorium along the walkway side of the building.  
  • Workers installed metal lathe around the center columns in the Tiger Room.
  • Copper piping for the AHU was installed in the 2nd Floor mechanical room.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • Workers continued installing electrical conduits for the new switch gear on the 2nd Floor.
  • Flashing was installed along the parapet wall on the roof. 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • A crew began removing the ceiling in the 2nd Floor network closet.
  • The contractor installed pipe hangers for the diesel fuel line in Rooms 136, 138, and 155.

CEB COVERED WALKWAY:

  • Facility Services began installing electrical conduit for the walkway lighting from the canopy closest to the Clinical Education Building towards the District Energy Garage. 

CSRB EXHAUST UPGRADE:

  • The contractor created two floor penetrations in the 7th Floor mechanical room for exhaust duct riser # 3.