Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, NOVEMBER 16, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor framed the fur down on the 1st Floor that parallels Bolivar Street.  
  • Workers continued insulating the heating hot water lines and capped the by-pass line for the heating hot water lines. 
  • Ductwork is being installed in (the new) Auditorium 3.     

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor terminated electrical wires for the transformers on the roof.
  • The CMU walls in the switch gear room on the 2nd Floor were primed.
  • Asphalt primer was placed in the trenches near the A tower and underneath the new addition building on the ground floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued the installation of elevator pit parts in the freight elevator.
  • Approximately two-thirds of the ceiling was removed from the 2nd Floor network closet.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor trenched a path for the emergency electrical feeds near the basement wall to the existing emergency generator.