FRIDAY, NOVEMBER 19, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor re-filled the heating hot water lines and the insulating contractor continued to insulate the heating hot water lines. 
  • Workers continued removing ceiling and floor tiles on the 2nd Floor.   
  • Crews hung sheet rock along the MEB side of the auditorium, set electrical receptacles, and installed studs for the mechanical room behind the auditorium. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued pulling electrical wires for the campus standby power system.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to weld the fuel line in Rooms 138 and 155.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits in the basement for the emergency electrical feeders.

DENTAL SCHOOL AIR HANDLING UNIT REPLACEMENT:

  • The contractor removed three windows to allow for the temporary ductwork and Facility Services installed plywood to cover the openings.