FRIDAY, DECEMBER 10, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running conduit for receptacles and light fixtures along Gravier Street on the 2nd Floor.    
  • The mechanical contractor ran condensate drains for the air handling units on the 1st Floor. 
  • The contractor also started running copper piping for the new domestic water feed for the building.    
  • The contractor began fabrication for the switchgear platform in the existing generator room. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued repairing the main roof of the Residence Hall.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued repairing the roof in preparation of the placement of the emergency generator platform.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor installed electrical conduits in the basement to relocate existing electrical panels to the 1st Floor.

CEB COVERED WALKWAY:

  • The contractor continued welding the steel canopy supports for the walkway roof near the District Energy Garage.

CSRB EXHAUST UPGRADE:

  • The contractor continued cleaning and removing the existing exhaust duct on the 1st Floor in the rear corridor.

DENTAL SCHOOL CAMPUS ROAD REPAIRS:

  • The contractor saw-cut expansion joints, erected curb forms for both driveways, erected sidewalk forms and placed the sidewalk base course.