Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, DECEMBER 10, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running conduit for receptacles inside the auditoriums.  
  • The mechanical contractor continued installing and insulating ductwork along the walkway side of the building and along Gravier Street on the 1st Floor.  
  • The contractor removed the existing metal louvers from the switchgear and generator rooms.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor began repairing the main roof of the Residence Hall.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed insulation on the roof in preparation for repairing the roof around the emergency generator platform.

CEB COVERED WALKWAY:

  • The contractor continued welding the steel canopy supports for the walkway roof near the entrance to the CEB.

CSRB EXHAUST UPGRADE:

  • The contractor connected the temporary exhaust duct.
  • Crews began cleaning and removing the existing exhaust duct on the 1st Floor in the rear corridor.

DENTAL SCHOOL CAMPUS ROAD REPAIRS:

  • The contractor poured and finished concrete in the Army and Navy Boulevard driveways.