TUESDAY, JANUARY 11, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor ran cable tray in the 1st Floor ceiling along the MEB loading dock. 
  • Workers continued to correct the stucco punch list.
  • Crews continued installing metal studs for the birthing labs on the second floor.
  • The contractor installed metal grating for the new generator room on the 1st Floor.      

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor began painting the ceiling in the 1st Floor elevator lobby.
  • They began correcting items on the stucco punch list.   

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor removed a portion of the transformer vault roof.
  • Crews removed brick pavers between the generator and the new walkway.

CSRB EXHAUST UPGRADE:

  • The contractor relocated conduit and sprinkler heads in the 7th Floor mechanical rooms.
  • Duct work was installed in the 3rd and 4th Floor mechanical rooms.
  • The 1st Floor duct work was pressure tested.

CEB COVERED WALKWAY:

  • The contractor continued welding the tapered supports for the canopy closest to the CEB.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued fabricating the 3 inch heating hot water riser for the penthouse. 

DENTAL SCHOOL LIGHTING REPLACEMENT PROJECT:

  • The contractor replaced 35 light fixtures on the 8th Floor of the Clinic Building along the horseshoe side of the building.