Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, JANUARY 20, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to correct items on the stucco punch list.
  • Workers continued running conduit from the emergency generator to the ATS on the 2nd Floor.   
  • The contractor cored one of four floor penetrations in the 2nd Floor network closet.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor finished priming the exterior pre-cast concrete wall for the new building.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued painting the walls on the 1st Floor.
  • They installed wire to the new automatic transfer switch for the emergency lighting.
  • The contractor began cleaning the bricks on the loading dock.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits in the basement and on the 3rd Floor in preparation to relocate existing electrical panels.
  • They continued the excavation near the transformer vault in preparation for underground utilities.

CSRB EXHAUST UPGRADE:

  • The contractor continued insulating the exhaust ductwork on the 1st Floor.
  • The floor penetrations for the duct riser were cut in Rooms 636A and 536A1.
  • The contractor installed the exhaust duct riser in the 6th Floor (south) mechanical room.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued to fabricate and install the chill water lines for the AHU above the Oral Pathology lab.