ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued running conduit for fixtures and receptacles on the 1st and 2nd Floors.
  • Crews began installing ceiling grid supports in the 1st Floor offices along the Bolivar Street side of the building. 
  • They continue to prepare the concrete floor to allow for the AV conduit in Room 138. 

CEB COVERED WALKWAY:

  • The contractor completed installing tapered supports for the canopy closest to the Clinical Education Building and for the canopy at the District Entergy Garage.

CSRB EXHAUST UPGRADE:

  • The contractor relocated conduit in the 2nd and 3rd Floor mechanical rooms. 

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued demolishing the ductwork on units 8B (Oral Pathology) and 8D (Gross Anatomy lab).
  • The contractor prepared to pour the concrete foundation pads for the new AHUs.

DENTAL SCHOOL LIGHTING REPLACEMENT PROJECT:

  • 36 additional light fixtures were installed on the 8th Floor along the horseshoe side of the Clinic Building.