Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, FEBRUARY 1, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • Workers continued priming the stucco in the office area on the 1st Floor.
  • They continued running fire alarm conduit in the large auditorium.   
  • The contractor continued installing the ceramic wall tiles in the 1st Floor restroom near Gravier Street.
  • Wire was pulled to the new raised emergency life/safety generator.
  • The storefront framing for birthing labs was installed.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued painting the walls in the electrical room of the elevated mechanical/electrical structure.
  • Crews pulled wires from the new transformer to the 3rd Floor electrical panel for the apartment ranges in Tower A. The ranges in Tower A are now energized through new switchgear.  

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing existing heating hot water pipes and installing the 10 inch supply heating hot water pipe in the basement.
  • Workers removed walls in the elevator pit #8.
  • They continued to install conduit in Room 224C. 

CSRB EXHAUST UPGRADE:

  • The contractor continued installing metal lathe on the ceiling of the 1st Floor.
  • Workers continued installing electrical conduit on the 7th Floor.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued running chilled water lines for the AHU above the Gross Anatomy lab.

DENTAL SCHOOL LIGHTING REPLACEMNT PROJECT:

  • The contractor replaced 22 light fixtures in locker rooms on the 7th Floor of the Clinic Building.