Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, FEBRUARY 14, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor began installing the ceiling grid and fire sprinklers in the office area on the 1st floor. 
  • They continued insulating the ductwork on the 2nd Floor. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor pulled a temporary feeder for the A/C on the 11th Floor.
  • Two metal doors were installed on the 2nd level (entry door from the basketball court).

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor primed stainless steel doorframes for 1st Floor.
  • Power for the AHUs for the 7th and 8th floor and for the jockey pump serving the fire pump was transferred to the new switchgear.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing heating hot water and chilled water piping in the basement.
  • They rerouted the sewer line near the generator and the 2-inch chill water lines for the 1st Floor AHUs.

CSRB EXHAUST UPGRADES:

  • The contractor installed conduits on the 7th floor near the mechanical room.

CEB COVERED WALKWAY:

  • The contractor continued installation of the corrugated metal roof decking.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued fabricating the valve package for the VAV boxes. 
  • They installed supply ductwork and heating hot water for the unit above Oral Pathology. 

DENTAL SCHOOL STUDENT ATHLETIC FIELDS:

  • The contractor set the cast iron drain inlets for the catch basins and began clearing and grubbing the field.

DENTAL SCHOOL LIGHTING REPLACEMENT:

  • The contractor installed 15 light fixtures on the 5th Floor of the Clinic Building.