Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, APRIL 7, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor installed receptacles in the de-briefing rooms on the 2nd floor.
  • Crews continued installing the stairs in the generator room.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor painted 11 of the new 23 doors installed on the 1st Floor and continued sanding the remaining doors.
  • They finished installing louver doors for the domestic water pump room and the switch gear room on the 2nd level of the new addition building.
  • Workers installed 4 transom panels on the 2nd level by the basketball court entrance gate.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor began constructing the south wall of the fire pump room on the 2nd Floor.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued welding and installing 8-inch chilled water pipes in the basement.
  • They installed electrical conduits on the 3rd Floor and continued removing non-operable switchgear and associated conduits from the basement.

CSRB EXHAUST UPGRADE:

  • The contractor installed new exhaust ductwork on the 1st Floor for Rooms 106, 107 and 110.

DENTAL SCHOOL BLDG EXTERIOR WATERPROOFING:

  • The contractor continued pressure washing the east side (5th bay) of the Clinic Building.
  • Their crews continued removing and installing caulking on the south wall of the Clinic Building and the east wall of the Administration Building. 

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor replaced the heating water B-side riser on the 2nd Floor.
  • They started testing the controls at the VAV boxes near Oral Pathology.
  • The asbestos contractor removed ductwork from the mechanical room, parking services area, and the Mens restroom.
  • The contractor removed the two building management system panels and electrical disconnects from the wall in Room 2110.

DENTAL SCHOOL LIGHTING REPLACEMENT PROJECT:

  • The contractor replaced another 17 fixtures on the 2nd Floor of the Administration Building.

DENTAL CAMPUS PARKING LOT LIGHTING:

  • The contractor continued installing direct-buried electrical conduit between the new light poles.