ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor started installing sheetrock in the 2nd Floor pump room. 
  • Workers continued setting the new door frame for the entryway into the new switchgear room on the 2nd Floor. 
  • The contractor continued installing the new med-gas manifold system on the 2nd Floor.    

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed interior dampers for the louvers on the 2nd Floor of the new elevated structure.
  • They continue removing abandoned conduit on the 1st Floor of the main building.
  • Crews continued painting the domestic water pump room on the 2nd Floor.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued welding and installing chilled water pipe in the basement.
  • They began installing electrical wires on the 3rd Floor.
  • Workers continued erecting forms for the elevator shaft wall in the basement.

CSRB EXHAUST UPGRADE:

  • The contractor completed work on the plaster ceiling on the 1st Floor.
  • The fire sprinkler heads were installed in the 1st Floor corridor.

CEB COVERED WALKWAY:

  • The contractor began installing the roof decking on canopy A at the end of the covered walkway closest to the District Energy Garage.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued sealing ductwork connections on the 8th Floor of the Clinic Building. 
  • They continued installing heating water lines for the 8th Floor reheat lines for units 8D and 8A.
  • Crews started installing the main chilled water lines for 8A.        
  • The contractor continued installing the main branch lines for the 2nd Floor reheat lines for unit L2A in the Administration Building.  The contractor has tied in 3 of 12 VAVs.  
  • The contractor continued installing the spiral ductwork for unit L3A and installed the spiral duct in the bookstore.     

DENTAL SCHOOL BLDG EXTERIOR WATERPROOFING PROJECT:

  • The contractor continued removing existing caulk and installing new caulk on the north side of the Clinic Building and on the south side of the Administration Building.