Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, AUGUST 2, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 1st Floor.
  • They continued installing bracing along the corridor wall on the 1st Floor.
  • Workers continued installing the high pressure steam line in the basement and building forms for the columns in the Lakeside Lot. 

CSRB EXHAUST UPGRADE PROJECT:

  • The fan and VFD supports for exhaust system #9 were installed on the roof.
  • The contractor continued installing electrical conduit on the 7th Floor to provide power to the rooftop exhaust fans.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued insulating supply duct on the 6th Floor and installing heating hot water lines for unit 6A.
  • Crews continued to tape and float the sheetrock ceiling for the Men’s restrooms on the 3rd and 6th Floors.  
  • Workers are installing supply air duct in the 6th Floor mechanical room. 
  • The contractor continued to install both control panels on the 3rd Floor. 

DENTAL CAMPUS BLDG EXTERIOR WATERPROOFING PROJECT:

  • The contractor sealed exterior panels on the north and west side of the Power Plant building.  The project is now substantially complete.