Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, AUGUST 22, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 2nd and 3rd Floors and the steam supply line in the basement.
  • Workers continued building forms and installing steel rebar for the grade beam by the auditorium side of the building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor began installing 3 VFDs (Variable Frequency Drives) on the roof for exhaust system 9.
  • Crews continued installing the round exhaust ductwork for exhaust riser 10 on the 6th Floor.
  • The exterior perimeter rooms on the 2nd Floor were connected to the new exhaust ductwork in phase 2A.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor built forms and installed rebar for the concrete pad for unit 5A in the Clinic Building.
  • Six (6) VAV boxes were installed on the 5th Floor for unit 5A.
  • The contractor continued removing light fixtures and ceiling tiles in the Library.