CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 2nd Floor.
  • The storm drain line for the new elevated mechanical/electrical structure was installed.
  • Crews continued building forms and installing steel rebar for the grade beam by the auditorium side of the building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor continued installing the three (3) VFDs (Variable Frequency Drives) on the roof for exhaust system #9.
  • Ductwork for exhaust system #9 was installed in Room 729.
  • The contractor began insulating the ductwork in phase 2A.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor installed the drain pan for unit 5A in the Clinic Building.
  • They began installing ductwork for unit 5A.
  • The contractor finished removing light fixtures and ceiling tiles in the Library.
  • Workers relocated the VFD for unit 3A in the Administration Building.