CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 1st Floor.
  • Crews continued installing bracing along the corridor wall on the 1st Floor.
  • The contractor continued installing the high pressure steam line in the basement,
  • Workers began installing steel rebar for the grade beams in the Lakeside Lot. 

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor installed the air plenum, fan supports, and VFD supports for exhaust system #10 on the roof.
  • They continued installing electrical conduit on the 7th Floor to provide power to the rooftop exhaust system #1.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor started units 3A and 3B in the Clinic Building.  Both units are running manually. 
  • They continued installing heating hot water lines for unit 6A. 
  • Workers continued installing the sheetrock ceiling for the Men’s restrooms on the 3rd and 6th Floors of the Clinic Building.  
  • The 7th Floor lab exhaust ductwork in 7401B was replaced.   
  • Crews continued installing both control panels and thermostats on the 3rd Floor of the Clinic Building. 
  • Fire alarm wire for unit 6A was installed. 
  • The contractor continued insulating supply duct for unit L3A in the Administration Building.
  • They are installing duct detectors for units L2A and L3A.