MONDAY, AUGUST 8, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 1st Floor.
  • They continued installing bracing along the corridor wall on the 1st Floor.
  • Crews continued erecting forms for the grade beams in the Lakeside Lot. 

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor installed the exhaust fan platforms for exhaust systems #9 and #10.
  • Workers continued installing electrical conduit on the 7th Floor to provide power to rooftop exhaust systems #1 and #3.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued insulating the heating hot water line for unit 6A in the Clinic Building. 
  • Crews continued installing fire alarm wire for unit 6A and started installing fire alarm wire for units 3A and 3B.
  • The contractor continued installing control panels and thermostats on the 3rd Floor.