CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued erecting steel framing on the 3rd level of the 2nd bay of the new building.
  • They continued installing conduits along the 1st Floor corridor.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor continued to remove the ceiling in the cage washing area.
  • The VFDs for exhaust system #1 are being installed on the roof.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued to demolish the supply ductwork for unit 5B in the Clinic Building.
  • Crews started installing the new supply ductwork and VAVs for unit 5B.
  • They continued installing the ceilings on the 5th and 2nd Floors. 
  • The contractor started up unit 2A.
  • The electrical demolition of units 7A and 7C was finished. 
  • The contractor demolished heating hot water lines near units L4C and L4D in the Administration Building.