CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit from the back corridor to the MEP building.
  • They continued installing the 2" steam piping line in the basement.
  • Workers continued setting door frames for the corridor to the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor pulled wiring for fan systems #1 and #2.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued insulating ductwork, installing ductwork transitions, and installing chill and heating hot water lines for unit 6B in the Clinic Building.  
  • Crews continued installing heating hot water lines for units 7D and 7A and installing control wiring for the 2nd, 5th and 7th Floors. 
  • The installation of the heating hot water lines in the Library is complete.
  • Workers continued installing ceiling grid in the Library. 
  • The contractor continued insulating chilled and heating hot water lines for units L4C and L4D in the Administration Building.
  • Ductwork and pipe insulation was removed from the mechanical room for units L2B and L3B.
  • The contractor removed lights for unit L2B.   

DENTAL SCHOOL ADMIN BLDG 1ST FLOOR ABATEMENT:

  • The contractor continued removing ductwork and insulation on the 1st Floor.