CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit and storm drain pipes on the 3rd level of the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The control panel enclosure for fan system #3 was installed.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing heating hot water lines for unit 6B in the Clinic Building.  
  • They finished insulating the chill and heating hot water lines for units 7A and 7D. 
  • Workers began to install the Men’s restroom ceiling on the 7th Floor.
  • The installation of the ductwork and VAVs for unit 4A is proceeding. 
  • The contractor continued installing ductwork and VAVs for unit L2B in the Administration Building. 
  • They continued to insulate the ductwork and began to insulate the heating hot water lines for unit L3B.