CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit and storm drain pipes on the 3rd level of the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor installed the fan motor EF-1C.
  • The control panel enclosure for fan system #2 was installed.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor finished installing the heating hot water lines for unit 6B in the Clinic Building and began to pressure test the lines. 
  • Crews continued installing the 7th Floor Men’s restroom ceiling.  
  • The contractor continued installing ductwork and VAVs for unit 4A and started installing the heating hot water lines. 
  • The mechanical room CMU block wall for unit 4A is being removed. 
  • The contractor continued installing ductwork and VAVs for unit L2B in the Administration Building and pressure tested the ductwork. 
  • They completed insulating heating hot water lines for unit L3B.
  • The mechanical room CMU walls for units L2B and L3B are being constructed. 
  • The contractor started installing control wire for units L2B and L3B.