CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor completed constructing the CMU wall for the transformer vault.
  • They began installing the 2" steam piping line in the basement.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor continued installing conduit for the controls of fan system #2.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor installed ductwork transitions and insulated the ductwork for unit 6B in the Clinic Building.  
  • The new unit 6B was set in place. 
  • Crews continued installing the heating hot water lines and chill water lines for unit 7D.
  • They continued installing control wiring for the 2nd, 5th and 7th Floors.
  • The contractor sealed the stainless steel ductwork in Room 3345 in the Clinic Building. 
  • Light fixtures were removed in preparation for replacing unit L2B. 
  • The contractor continued installing the heating hot water lines in the Library.

DENTAL SCHOOL ADMIN BLDG 1ST FLOOR ABATEMENT:

  • The contractor continued removing ductwork and insulation on the 1st Floor.