FRIDAY, DECEMBER 16, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduit on the 2nd & 3rd levels of the MEP building.
  • They continued installing storm drain pipe on the 3rd level of the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor completed removing the old exhaust ductwork associated with phase 2B of the project.

DS CLINIC AHU REPLACEMENT   

  • The contractor continued installing ductwork, VAVs, and heating hot water lines for unit 2B in the Clinic Building.
  • The metal pan for unit 2B was welded. 
  • Crews continued to insulate the new ductwork and heating hot water lines for unit 4B.
  • The ceiling in the 4th Floor men’s restroom and the 4th Floor ceiling grid is being installed. 
  • The contractor continued insulating the chilled water and heating hot water lines for units L2B and L3B in the Administration Building.   
  • Workers continue installing the heating hot water lines for unit L2B.
  • The new CMU wall has been erected in the Library workroom.