Purchasing Guidelines
Local/Office Moves
Our
contract for local office moves has provided a tremendous amount
of flexibility in our Post Katrina environment. However,
we have seen a pattern begin to develop that necessitates our
documenting the proper process to utilize this contract.
-
No move should be
arranged before it has been approved by the appropriate
parties within the school leadership. Check with your Deans
and Assistant Deans to ensure that all parties are
informed.
-
Once the need is
identified, all relevant information should be documented
and communicated to Bill Tremblay via email. A form is
being developed to more consistently capture this
information.
-
If there is equipment to
be relocated, a Work Order with all of the relevant details
should also be submitted so that all infrastructure needs
can be evaluated. The Equipment will not be moved until
Facilities has communicated their approval to Purchasing.
-
Bill will communicate
the basic need to the Moving Contractor.
-
Representatives from the
Moving Contractor will contact the Department to arrange for
a site survey of everything to be moved
-
A quote will be
developed and communicated to the Department and Purchasing.
-
A requisition should
then be created.
-
After all relevant
approvals have been received; Purchasing will instruct the
Moving Contractor to proceed with scheduling the move.
-
Asset Management should
be notified of the move (assuming that there are tagged
items being moved) through their normal channels
|