Louisiana State University Health Sciences Center Administration & Finance
 

Friday, March 24, 2006

  • Repairs to the fire alarm system at the MEB are complete. The State Fire Marshal is scheduled to inspect the system on Tuesday.
  • The elevator contractor encountered problems in the installation of the 1st floor elevator doors at the Lions/LSU Clinic Building. While the problems are being resolved, it has delayed the planned inspection by the State Elevator Inspector. That inspection will be rescheduled as soon as the installation of the doors is complete.
  • The environmental remediation contractor anticipates that they will complete the removal of all damaged floor tile from the Residence Hall on Saturday.