  • The last of the work required to replace the damaged electrical feeders at the CSRB was completed over the weekend.
  • The environmental remediation contractor working at 1542 Tulane is completing the cleaning of the spaces on the 1st and 2nd floors. They are also cleaning the ducts on the 1st floor and the majority of the flood damaged walls in the basement have been demolished.
  • The floors in the Gross Anatomy Lab are being prepared for the application of the new epoxy floor surface.