  • LSUHSC Facility Services staff discovered a leak in a steam condensate return pipe above a light located in a 6th floor mechanical room in the Dental School Clinic Building .
    • Repairs will be made by LSUHSC this Saturday. 
  •  The new motor control center for the Dental Power Plant was delivered today. 
    • The contractor uncrated the motor control center and prepared it to be lifted up to the mezzanine of the Power Plant.
  •  The elevator contractor is making repairs to the Dental School Administration Building elevators while the ceiling is being removed in the 1st floor of the Clinic Building . 
  •  The 1542 Tulane Ave. contractor continued to run conduit for transfer switches and to pull electrical wires for the lighting in the basement.