Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, April 19, 2007

Dental School :

  • An AT&T representative and their construction crew visited the site in preparation for doing the work needed to restore communications to the Dental School buildings.
  • Zimmer has completed removing the carpet from the 4th floor in the Clinic and Administration Buildings.

1542 Tulane Ave.:

  • Ordes Electrical spent a half of day on site removing old electrical panels from the basement.
  • Stratos Elevators worked on Elevator #3; installing safeties and balancing Elevator# 3.
  • Arc Mechanical worked on the demolition of old pumps and air compressors in the basement.

 Irrigation Project:

  • All the new water meters are now installed.  Most of the damage to the streets and sidewalks has been repaired. 
  • All of the sleeves that LSUHSC Facility Services personnel can install under the sidewalks at the Lions/LSU Clinic and the CSRB have been installed.
  • The installation of the irrigation pipe and electrical wire has begun for the irrigation system at the Lions/LSU Clinic.