Louisiana State University Health Sciences Center Administration & Finance
 

Monday, April 23, 2007

Dental School : 

  • Zimmer removed carpeting from the 5th floor of the Clinic Building.
  • Boe-Tel delivered the cable trays and placed them in the halls and lobbies of the building where they will be installed.   
  • AT&T needed electrical power to load software onto the system in the new location for the telephone switch on the 5th floor of the Clinic Building .  When the outlet provided did not have power, Pflueger Electric was called out.  They were able to identify and resolve the problem.

1542 Tulane Ave.:

  • Arc Mechanical started removing the damaged air compressors and pumps from the basement.
  • Stratos Elevator worked on the safeties for Elevator #3. 
  • Ordes Electrical continues to work on the air handling unit power and related control panels in basement. 

Irrigation Project: 

  • The main line to the circle drive at the Lions/LSU Clinic Building is completely installed and buried. 
  • Trenching for the sprinkler lines at the corner of S. Prieur and Gravier St. was completed today.