  Dental School :

  • Cingular removed some towers from the outside wall of the penthouse. They have a contractor patching the holes and will finish the patching tomorrow. 
  • Pflueger Electric started the disassembly of the old Motor Control Center.  At 4:00 PM they started the installation of the new one.
  • Schindler worked on the passenger elevators in the Clinic Building .
  • Zimmer has removed all of the ceiling grid from the 5th floor of both buildings.

 1542 Tulane:

  • Ordes Electrical continues to install 4" conduit to service the additional switch gear. 
  • Stratos Elevators was working on the cab of Elevator #3.
  • Arc Mechanical worked on the repairs to the steam station.