  Dental School :

  • A representative from York was onsite to examine Chiller #2 to determine the reason that it is tripping the breaker at the switch gear.  It appears that the chiller has a bad motor which will have to be replaced. 
  • Zimmer worked on Saturday and they have now removed the ceiling tile grid from the 6th, 7th and 8th floors of the Clinic Building. 
    • They must still remove the plastic barriers that were installed on the 8th floor.
  • The elevator contractor worked in the penthouse of the Administration Building installing new motors.
  • Siemens was on site setting up the computer that operates the building control & monitoring system.

 1542 Tulane:

  • Ordes Electrical continues to work on installing the 4 inch conduit to accommodate the additional switchgear that is on order.
  • Stratos continues to make repairs to the cab for Elevator #3.
  • Arc Mechanical was working on the repairs to the steam station again today.

 Irrigation Project: 

  • LSUHSC Facility Services personnel continue to install sleeves underneath sidewalks.  Two more sleeves were installed today.