Louisiana State University Health Sciences Center Administration & Finance
 

Monday, November 19, 2007

1542 Tulane Ave. :

  • Zimmer-Eschette was awarded the contract for the final remediation, duct cleaning and paint removal contract.
    • They are mobilizing equipment and workers to prepare for the beginning of the work.
    • They are setting-up negative-air machines, dehumidifiers, and containment barriers.
    • They are also removing the trash bags throughout the buildings.

Dental School

  • Landis refinished the 1st floor lobby floors in the Clinic Building over the weekend.
    • They began touching up the walls and fur downs in the lobby.
    • They also stained and performed corrective work on the doors.
  • The contractor began touching up the finish on the walls in the 2nd Floor Conference Room in the Administration Building .
  • Eustis Engineering is conducting the soil borings at the site of the proposed Annex that is central to the Section 406 Hazard Mitigation proposal.
    • They have bored the second hole and retrieved the soil samples from that boring. 

Landscaping Project:

  • Crews planted Savannah holly trees and shrubs on the S. Roman St. side of the Allied Health/Nursing Building today.