Louisiana State University Health Sciences Center Administration & Finance
 

Wednesday, November 07, 2007

1542 Tulane Ave.:

  • Ordes Electric continues to install the new Entergy Thermal control box (PLC) which monitors the controls on the Energy Transfer Station.
  • Stratos Elevator continues to work on Elevator #7; installing the tape selectors which aids in the automatic cab leveling.
    • The contractor is installing the wiring for the Elevator #8 controller.
  • Siemens continues to install new fire alarm wiring, speakers, and strobes on the 6th floor.
  • The painting contractor began removing the peeling paint in Stairwell B.
    • The paint has been removed on Floors 4 through 8.
    • They are floating the walls on Floors 7 and 8.
  • Faculty and staff continue to clean out offices and remove personal items on Floors 5 and 6.

Dental School :

  • Most of the ceiling mounted fixtures have been installed throughout the 1st Floor lobby of the Clinic Building.
    • The installation of the Curvature ceiling panels continues.
    • All of the carpet has been installed in the lobby.
  • The painting is complete in the conference room on the 2nd Floor of the Administration Building .
    • The installation of the new ceiling tile began today.
  • The installation of the inline dampers is complete.
    • Siemens has finished installing the controls for the new dampers on the 6th through the 8th floors.
    • They are now working on the 5th floor.
    • Landis began reinstalling the ceiling on the 8th floor where it was removed to change out the dampers.

Landscaping Project:

  • Crews began the installation of the irrigation system on the S. Roman St. side of the Allied Health/Nursing Building.