Louisiana State University Health Sciences Center Administration & Finance
 

Thursday, December 6, 2007

1542 Tulane Ave. :

  • Stratos Elevator is cutting out damaged materials from Elevator #1.
  • Zimmer-Eschette is continuing to clean the 8th Floor.
  • Zimmer is cleaning the ducts on the 4th and 5th Floors.
  • Zimmer continues to remove debris from the 7th Floor.
  • AEC has taken samples from the 7th Floor.

Dental School :

  • The contractor completed the installation of the column wraps in the Clinic Building lobby.
  • Zimmer installed the reinforcing straps on the realigned flood wall panel to secure it in place.

Exterior Lighting Project: 

  • Ordes is working on the bollard lights at the Allied Health/Nursing Building.
  • The work has been completed at the MEB.

Landscaping Project:

  • Crews completed trenching for the piping that will support two of the three irrigation stations on the S. Roman St. side of the MEB at the entrance/exit to the loading dock area.