Louisiana State University Health Sciences Center Administration & Finance
 

Friday, March 28, 2008

1542 Tulane Ave. :

  • Stratos Elevator is applying touch-up paint on the elevator lobby doors for Elevator #1.
  • Siemens continues to install new fire alarm wiring and devices along the center corridor of the 2nd and continues to test the all fire alarm devices that have been installed.
  • Zimmer-Eschette continued cleaning on the 1st floor in the old section of the building on the Charity side and in the Shipping and Receiving area.
  • The drywall contractor continues to sand and prep the walls on the 2nd Floor.
  • The contractor finished removing the floor tile from the 2nd Floor in the old section of the building on the Charity side.
  • They began removing floor tile from the 2nd Floor in the old section of the building on the I-10 side.
  • The painting contractor continues to apply finish paint around the windows and doors on the 3rd Floor in the offices along Tulane Ave. and the center corridor.
    • The contractor is also applying touch-up paint in the offices on the 4th Floor.
  • The contractor continues with the installation of ceiling tiles on Floors 1 through 7.
    • They continue to trim and install the edge and corner tiles on the 6th floor.
    • Ceiling tile installation in the offices on the 1st, 2nd, and 3rd Floors are complete with the exception of edge, trim, and corner tiles.
  • Royerre Commercial Carpets continue prepping the concrete sub-floor and installing new carpet tiles on the 6th Floor in the offices along Tulane Ave. and the center corridor.
    • The contractor began prepping the sub-floor and installing new carpet tiles on the 8th Floor in the offices along the center corridor.

Dental School :

  • The construction of the temporary bookstore is substantially complete.
    • The contractor tested the fire alarm system. 
    • They started working on their punch list.
    • Auxiliary Enterprises was notified that they can have the slat wall system installed.
    • Securitas terminated the data cables for the cash registers and data ports in the bookstore.
  • Schindler is installing new switches on the freight elevator.