Louisiana State University Health Sciences Center Administration & Finance
 

Friday, April 18, 2008

NOTICE: On Saturday, April 19th there will be a chilled water outage at the Lions/LSU Clinics Building.  This outage will start at 3:00 AM and will be completed by 6:30 PM.  During this time there will be no air conditioning in the building, except in the 9th Floor animal care area.

1542 Tulane Ave. :

  • The ceiling tile contractor finished installing edge and corner tiles on the 2nd Floor.
    • Crews continue trimming and installing the edge and corner tiles on the 1st Floor.
  • Royerre Commercial Carpet continues to install cove base and transition strips on the 3rd and 7th Floors.
    • The contractor finished installing VCT on the 3rd and 4th Floors.
  • Hogues continues to install the new ceiling fixtures on Floors 5 and 6.

Lions/LSU Clinic Permanent Repair and Mitigation Project:

  • CMI is still framing up the new interior walls on the 6th Floor.
  • The rough in plumbing and electrical work continues for the new laboratory space on the 7th Floor.
  • The crew that is cleaning the 1st Floor windows and applying the anti-corrosion coating to the metal window frames is continuing their work at the rear of the building.

Exterior Lighting Project:

  • Frischhertz has finished the installation of new lights for the Residence Hall Parking Lot under I-10.